Monday, October 27, 2014

Aboveground Storage Tank Compliance: Guidelines for Your Facility - Webinar 11/20/14

,

This practical 60-minute webinar provides and the latest regulatory
requirements to keep your facility compliant with aboveground tank
requirements. Please join us for:

"Aboveground Storage Tank Compliance: Guidelines for Your Facility"
Thursday, November 20, 2014 (1:00-2:00 p.m. ET)
http://www.pbconferencing.com/3ZK/0/?C=7991&P=1070804&T=1&S=2205&D=1

AST Compliance: Meeting SPCC Requirements
  • Guidelines for managing and maintaining your tanks
  • Correct signage, labeling and recordkeeping practices
  • Determining if certification is required for your facility

Maintaining ASTs: What’s Required Today
  • Strategies to find and fix tank leaks
  • Maintaining and protecting tank system integrity
  • Why tanks fail - and how you can prevent it

Tips to Prepare for an AST Inspection
  • Characterizing your tank for SPCC
  • Monthly & annual owner inspections
  • Addressing repairs and problems with tanks

Live Question and Answer Session - Get expert answers to your specific tank questions

Your Presenter:
David Piercey has over 28 years experience and is recognized as one of the
country's leading tank specialists. His extensive background includes:
  • Instructor for the various organizations on tank installation, repair and
    standards.
  • Contributing Author for "Aboveground Storage Tank Management and SPCC Guide"
    and "Underground Storage Tank Management," both are published by ABS Consulting
  • Consulting with a wide range of facilities on developing SPCC and ICP plans
    to ensure compliance with EPA requirements.
  • Has conducted thousand of storage tank design, construction, upgrade, and
    inspection programs throughout the United States.
  • Works with clients nationwide to provide tank management programs for both
    underground and aboveground storage tanks.
  • Committee member for Petroleum Equipment Institute (PEI), recommended
    practices for Inspection and Maintenance for USTs, PEI-RP900 and PEI
    Recommended Practices for the Installation of USTs, PEI-RP100.

* Aboveground Storage Tank Compliance: Guidelines for Your Facility
* Live,(60)-Minute Webinar **
* Thursday, November 20, 2014 - (1:00-2:00 p.m. ET) **

Register now for this exciting event by clicking the following link or
calling 1-800-964-6033:
http://www.pbconferencing.com/3ZK/0/?C=7991&P=1070804&T=1&S=2205&D=1

We hope you'll join us.

Sincerely,

Progressive Business Conferences
384 Technology Drive
Malvern, PA 19355

P.S. If not satisfied, a full refund will be given from now until
7 days after the event.

If you do not wish to receive further notices about this conference or
future conferences, please click here:
http://www.pbconferencing.com/3ZK/46/?C=7991&P=1070804&T=1&S=2205&D=1

Please do not reply directly to this e-mail, as we are unable to
process it. We sent this using a send only address.



No comments:

Post a Comment